Current Projects

  •  Facilities
    • updated: February 8, 2012
      status: Under Construction
      Phased reconstruction of the Spanish Colonial walled garden that was part of the historic San Agustín Mission. Plantings representing several eras of Tucson agriculture, from ancient to modern are planned. Rebuilt on its original site and located today in the heart of downtown Tucson, the Mission Ga...
      location: eastern base of A-Mountain, corner of Mission Rd and Mission Ln
    • updated: January 12, 2012
      status: Under Construction
      See Website for more information. Design and construct a 7-acre expansion of the Reid Park Zoo. This expansion will include connecting pathways from the current zoo footprint, restrooms, drinking fountains, and a 3-acre elephant exhibit and ho...
      location: Reid Park Zoo
  •  Miscellaneous
    • updated: February 2, 2012
      status: Under Construction
      Replace aging plant equipment and infrastructure to provide continuity of service to Police Headquarters, Fire Headquarters and the TCC Complex.
      location: Tucson Convention Center
    • updated: January 10, 2012
      status: In Design
      Planned development includes 125 room boutique hotel, 400 residential units (of which 17.5% will be offered to households at or below 80% of Area Medium Iincome (AMI) and 17.5% will be offered to households between 80% and 125% of AMI) Additional development include office space, market, restauran...
      location: 14 Acres immediatly SW of Congress and Santa Cruz river
    • updated: October 25, 2010
      status: On Hold
      Phase I of Tucson Origins Heritage Park included west side infrastructure and some landfill remediation, and construction of the Tucson Presidio element of the park. The Heritage Park also includes the location: Westside South of Congress
    • updated: February 3, 2012
      status: Under Construction
      The New Armory Building will be six stories and provide 143 modern 1-bedroom affordable housing units for income-restricted Seniors, aged 62 and older. Each unit wil be approximately 650 sq ft. This project is the new home for residents of the old Armory Park Apartments also containing 143 units, 10...
      location: 795 W CONGRESS ST
    • updated: January 13, 2012
      status: In Design
      Design and construct safety, security, and comfort improvements as part of a comprehensive CPTED study. CPTED= Crime Prevention Through Environmental Design.
      location: NE Corner of 6th Av & Congress
  •  Transportation
    • updated: February 3, 2012
      status: Under Construction
      The Cushing Street Bridge construction and roadway improvement project is a vital link in the 3.9-mile Modern Streetcar project. The 320-foot-long ‘signature’ bridge will provide a shaded east-west connection for pedestrians, bicyclists, motorists and transit riders. When complete, the project i...
      location: Cushing Street, W of I-10, to span the Santa Cruz River
    • updated: January 13, 2012
      status: In Planning
      The project will be a modest, four-lane roadway north of the Union Pacific railroad tracks that will connect Barraza-Aviation Parkway to 22nd Street and I-10, offering an alternate access to Downtown, plus new underpass with the Union Pacific railroad. The project is divided into four separate const...
      location: north of the railroad tracks from Barraza-Aviation to the I-10 frontage road with a reroute of 6th S
    • updated: January 13, 2012
      status: Under Construction
      An approved four-mile modern streetcar line connecting the University of Arizona to the 4th Avenue commercial district, downtown and the redevelopment area west of downtown. Revenue generating operations are scheduled to begin October 31, 2013. ...
      location: University to Downtown