All Projects

Current Projects

  •  Facilities
    • updated: May 10, 2013
      status: In Planning
      The scope of work will focus on renovation/repair work to public areas and building systems at the City Courts Building, 103 E Alameda Street. Currently, the project team has put together a prioritized list of needed building improvements. These items may include, but are not limited to, analysis an...
      location: 103 E Alameda St
    • updated: May 10, 2013
      status: Under Construction
      The project will renovate and expand the existing police, fire and 911 facilities at the Thomas Price Service Center. In addition to the physical construction, the existing radio system will be transitioning to the regional Pima County Wireless Integrated Network (PCWIN) radio system....
      location: Park and Ajo
    • updated: May 3, 2013
      status: Under Construction
      Phased reconstruction of the Spanish Colonial walled garden that was part of the historic San Agustín Mission. Plantings representing several eras of Tucson agriculture, from ancient to modern are planned. Rebuilt on its original site and located today in the heart of downtown Tucson, the Mission Ga...
      location: eastern base of A-Mountain, corner of Mission Rd and Mission Ln
    • updated: May 10, 2013
      status: Pre-Design
      05.02.13
      Rio Nuevo Multipurpose Facilities District is investing $6M dollars into the Tucson Convention Center (TCC) Arena. Renovations being considered range from restroom improvements, signage / wayfinding including digital signage, concession stand renovations, floor and bowl seats, lightin...
      location: 260 South Church Ave., Tucson, AZ 85701
  •  Miscellaneous
    • updated: April 12, 2013
      status: In Design
      Planned development includes 125 room boutique hotel, 400 residential units (of which 17.5% will be offered to households at or below 80% of Area Medium Iincome (AMI) and 17.5% will be offered to households between 80% and 125% of AMI) Additional development include office space, market, restauran...
      location: 14 Acres immediatly SW of Congress and Santa Cruz river
    • updated: May 13, 2013
      status: Under Construction
      Design and construct safety, security, and comfort improvements as part of a comprehensive CPTED study. CPTED= Crime Prevention Through Environmental Design.
      location: NE Corner of 6th Av & Congress
  •  Transportation
    • updated: May 13, 2013
      status: In Planning
      Widen roadway to six travel lanes, two transit lanes, and a raised median. Improvements will also include curb, sidewalk, street lighting, bike lanes, and landscaping.

      This project is included in the Regional Transportation Authority 20-year plan. For additional information visit: location: Broadway Blvd between Euclid and County Club
    • updated: May 13, 2013
      status: In Planning
      The project will be a modest, four-lane roadway north of the Union Pacific railroad tracks that will connect Barraza-Aviation Parkway to 22nd Street and I-10, offering an alternate access to Downtown, plus new underpass with the Union Pacific railroad. The project is divided into four separate const...
      location: north of the railroad tracks from Barraza-Aviation to the I-10 frontage road with a reroute of 6th S
    • updated: May 13, 2013
      status: In Design
      This project was divided into two Phases: Phase 1. Work on the intersection of Sabino Canyon Road and Tanque Verde and Phase 2. Connecting Sabino to Kolb Road. Phase 1: Widening and reconstruction of the existing intersection to accommodate additional through lanes for north and south bound travel...
      location: Tanque Verde and Sabino Canyon Rd south to Kolb
    • updated: May 13, 2013
      status: In Design
      Design and construct gateway and intersection improvements along Stone Avenue from Drachman to Speedway.

      This project represents the final improvements from the Stone Avenue Corridor planning effort. Improvements to other areas have redirected traffic away from this corridor in order to im...
      location: From Speedway north to Drachman.
    • updated: May 13, 2013
      status: Under Construction
      An approved four-mile modern streetcar line connecting the University of Arizona to the 4th Avenue commercial district, downtown and the redevelopment area west of downtown. Revenue generating operations are scheduled to begin October 31, 2013. ...
      location: University to Downtown
  •  Water
    • updated: May 10, 2013
      status: Under Construction
      As directed by the Mayor & Council, Tucson Water is constructing a 1,4-dioxane treatment system. This system will allow Tucson Water to serve water from the TARP superfund treatment facility that meets the U.S. EPA Drinking Water Health Advisory level for 1,4-dioxane without having to blend the ...
      location: I-19 and Irvington Rd
    • updated: May 10, 2013
      status: In Planning
      Tucson Water and Pima County are engaged in a jointly funded reclaimed water recharge project in the southeast Houghton Road area. The project is planned to provide the capability to recharge reclaimed water that would ordinarily be discharged into the Santa Cruz River, resulting in beneficial use ...
      location: 5820 S Houghton Road,
    • updated: May 10, 2013
      status: Under Construction
      Construct an 8.5 million gallon potable water concrete lined reservoir along with a booster station having the ability to pump an additional 27.9 million gallons of water per day from the Southern Avra Valley Storage and Recovery Project (SAVSARP)....
      location: Avra Valley
  • 14 Projects Displayed